"Quality Asphalt Paving Since 1971"
HOMEPAGE ASPHALT PAVING PHOTO GALLERY ASPHALT PLANT WARRANTY INFO EMPLOYMENT
REQUEST A BID PREP & REPAIR DECORATIVE  ASPHALT CARE SNOW REMOVAL COMPANY INFO
 
MADISON'S COMMERCIAL & RESIDENTIAL ASPHALT PAVING COMPANY

DRS LTD has been serving the paving needs of Madison area customers for over 35 years. Our goal is to continuously deliver a quality professional service at an affordable price.  We recognize that each job site is unique and requires extra effort to complete it the right way.  Our friendly estimators are happy to walk you through the paving process, step by step, so we can complete the job just the way you want it. 

Is your driveway or parking lot

full of cracks after the tough winter?

The Paving Season is Now Rolling!
It may be time to replace that
old surface with fresh new look!!
CALL TODAY TO SET UP A FREE ESTIMATE !!
 
274-4932

 

 

Frequently Asked Questions

 

What time of year can my new driveway or parking lot be installed?

In Wisconsin, weather plays a big role in the asphalt industry. The typical paving season starts in May when the  temperatures are steadily above freezing and ends in November when the cold weather moves in to stay.

 

How much will a new driveway cost?

In the Madison area, most driveways/parking lots cost between $1.50 & $3.00 a square foot.  DRS can provide you a detailed estimate on your specific project free of charge.

 

How long will a asphalt driveway last?

The typical asphalt driveway can last up to 20 years. An important factor in the longevity of a driveway is the stability of the base and the quality of the asphalt mix.

 

Is every company’s asphalt mix the same?

Yes and No. The basic components of asphalt are the same but it's the subtle differences that make one better than the other.  DRS offers a patented rubberized asphalt mix that is produced at their own manufacturing plant where smaller quantities are made to ensure a higher quality mix is produced just for your project.

 

How long will it take to install a new driveway?

The typical driveway requires two days of on-site work. The first day is for preparation (removal, grading, etc.) and the second day is when the hot asphalt would be paved. The whole process could take a couple of days, up to a few weeks; depending on schedules, weather and/or other factors.

 

When can my driveway be driven on after construction starts?

Once the prep work is complete, most drives will allow for light automobile traffic until paving starts.  After paving is complete, it is recommended to keep all car traffic off of the new asphalt for at least three days and even longer during  warmer  temperatures.

 

 

**To ensure quality service, we can only serve the greater Madison area**
 
HOMEPAGE           ASPHALT PAVING           PHOTO GALLERY           ASPHALT PLANT           WARRANTY INFO           EMPLOYMENT
REQUEST A BID           PREP & REPAIR           DECORATIVE            ASPHALT CARE            SNOW REMOVAL           COMPANY INFO

Copyright © 2007.  All Rights Reserved. DRS LTD